Solar Cathodic Protection System

Solar Cathodic Protection System

About the project

Solar Cathodic Protection System for Strategic Pipelines from Km PS1to PS3 (km342)

Shamsh ltd contacted to supply and install Solar Cathodic Protection System for Strategic Pipelines in Iraq From Basrah for 342 KM.
  • Place
    Basra-Iraq
  • Client
    GCP/BOC
  • Date
  • Duration
    2 Years
  • Estimation
    EURO 8.4M
  • Category
  • Share